Bristol WPCF Phosphorus Reduction Upgrade

Client:

City of Bristol, CT

Location:

Bristol, CT

The work consists of construction  of the Bristol Water Pollution Control Facility, including demolition, civil and site work, yard piping, connection to existing utilities, bypass pumping and other measures to maintain plant operations, construction of new ballasted flocculation process tanks, installation of the pre-selected Kruger ACTIFLO equipment, installation of pre-selected Ozonia ultraviolet disinfection system, architectural and structural work related to the construction of the new phosphorus facility building; install aluminum sulfate, sodium hydroxide and liquid emulsion polymer storage and feed systems, HVAC, plumbing and fire protection work in the new phosphorus building and new electrical and instrumentation systems.