Emergency Generator Replacement

Client:
MDC
Location:
Barkhamsted, Colebrook, Canton, Hartland, CT
The project consists of installation of new emergency generators systems and other miscellaneous improvements at (7) existing water supply facilities complete and operation for the Metropolitan District in Barkhamsted, Canton, Colebrook and Hartland, CT. The work includes the removal of existing emergency standby generators systems and associated electrical equipment, new emergency standby generators and electrical control structures, electrical panels, switch gear, conduit wiring, instrumentation work; miscellaneous metals, earth excavation and backfill, abatement of lead paint, asbestos and PCB from existing surfaces and the demolition of existing electrical panel structures.


