The project work includes the construction of a new approximately 1.8 million gallon per day annual average water resource recovery facility (WRRF), work also includes a Headworks Building, a Sequencing Batch Reactor (SBR) system consisting of four SBR tanks and process equipment. A Post-SBR Equalization Tank, a Denitrification Filter system consisting of seven filter tanks and process equipment.
Other work includes:
-A UV Disinfection Building with UV disinfection system.
-A Process gallery and building spaces to house process and other equipment.
-A Process building to house administration, operations and other WRRF functional spaces.
-A Solids Processing Building and process equipment for sludge thickening and Waste Activated Sludge Storage Tanks along with an odor control system.
-Four infiltration basins for effluent disposal and groundwater recharge.
-A Vehicle Storage Building.
-Various site work.
-Demolition of existing facilities.
-Electrical work to support the WRRF systems and buildings.
-HVAC, Plumbing and Fire protection work to support the WRRF systems and buildings.
Delivery Method: Design, Bid, Build
Start Date: November 2024
Contract Value: $100 Million
Owner: Town Of Yarmouth, MA
Engineer: CDM Smith